https://www.mdu.se/

mdu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
INTRESSENTHANTERING OCH DESS PÅVERKAN PÅ PROJEKTRESULTAT: En jämförande analys av Hyndevad och Sätra med fokus på intressentpåverkansindex
Mälardalen University, School of Business, Society and Engineering.
Mälardalen University, School of Business, Society and Engineering.
Mälardalen University, School of Business, Society and Engineering.
2025 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The purpose of this work is to see if external stakeholders to a construction project have any connection to additional costs, measured through the stakeholder-impact-index. And to see how internal stakeholder management in the form of communication affects the same outcome. The method in this thesis will be a case study of two projects in water and drainage. One in Hyndevad, Eskilstuna and one in Sätra, Västerås. To get a good understanding of the projects and the crucial stakeholders, semi-structured interviews will be conducted with the person whose role was construction manager. To strengthen the results, engineering calculations will also be carried out linked to the stakeholders' attitude to the project. In the results, the stakeholder impact index calculations will be presented for each of the projects in a tabular structure. The calculations show that the external stakeholders in Hyndevad had a significantly more positive attitude towards the project than the external stakeholders in Sätra. Based on interviews, it will be presented how the communication between stakeholders and project team was carried out during the projects, addressing specific events where a link can be drawn between stakeholder management and possible cost increases. Finally, for the conclusion, based on these two projects, there is some correlation between stakeholder attitudes and communication over time and cost outcomes. And the communication part plays its role in it as well.

Place, publisher, year, edition, pages
2025. , p. 64
Keywords [en]
Stakholder
Keywords [sv]
intressent, intressenthanterkng, intressentpåverkansindex
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:mdh:diva-72561OAI: oai:DiVA.org:mdh-72561DiVA, id: diva2:1979678
External cooperation
Pq Projektledning
Subject / course
Building Engineering
Presentation
2025-05-28, Beta, Universitetsplan 1, 722 20 Västerås, Västerås, 20:13 (Swedish)
Supervisors
Examiners
Available from: 2025-07-01 Created: 2025-06-30 Last updated: 2025-10-10Bibliographically approved

Open Access in DiVA

No full text in DiVA

Search in DiVA

By author/editor
Jansson, HampusHögberg Sund, AlexanderKarlsson, Linus
By organisation
School of Business, Society and Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 92 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf