The purpose of this study is to examine how construction logistics work for the ongoing
project “Årstastråket” Stage 1, and to identify the logistics problems that the project may
have. The aim then is to find solutions to these problems in order to avoid them in the
upcoming projects. The study will include delopment of a standard template that can be used
in logistics planning of the project. At the beginning of the study a comprehensive literature
review of the available literature including reports and research articles was done to obtain a
deeper knowledge of the subject in question. The result of this study is based on conducted
case studies on the construction site, such as interviews and site visits. The majority of
collection in the case study was mainly collected from 11 site visits, which then was
supplemented with the information obtained from the interviews. The interviews were
conducted with the local manager and supervisor of the project at “Årstastråket” Stage 1. In
this study the construction logistics worked generally well, both in terms of transport- and
material flow at the construction site. The main logistics problems identified in “Årstastråket”
Stage 1 was particularly poor logistics planning of the project at an early stage, lack of visual
communication and constant updating of construction site plan alongside project developing.
The new developed standard template for logistics planning of the project at an early stage
can be used in order to achieve the established goals and make the project even more
effective.
Place, publisher, year, edition, pages
2015. , p. 57
Series
Mälardalen Studies in Educational Sciences
Keywords [en]
Communications, logistics planning, material flow costs, production, temporary factory
Keywords [sv]
Materialflödeskostnader, produktionsprocess, Kommunikation, Logistikplanering, tillfälliga fabriken
National Category
Construction Management
Identifiers
URN: urn:nbn:se:mdh:diva-28607OAI: oai:DiVA.org:mdh-28607DiVA, id: diva2:841249
External cooperation
STRABAG Sverige
Subject / course
Building Engineering
Supervisors
Examiners
2015-08-172015-07-112026-03-12Bibliographically approved